Sunday, August 8, 2021

Pool Update

 We are finally making some headway on the pool, plaster and the cool deck covering the deck surround and new concrete over shortened area of the pool is all that's left before water!


We also got the steel grates to replace the windows in the Spa room to allow a little more ventilation, once the deck is refinished we will take the windows out, rebuild the walls and install the grates which are 4 foot by 4 foot.


The current windows!


The tile has been installed and the deck over the filled in part of the pool.


The steps have been extended the full width of the pool.


The new deck is fantastic!





The tile


The solar panels and new pumps have been ordered and once we start putting water in the pool, they will be up to install the solar heat for the pool and spa.

Have a block layer coming out to quote putting block to replace some of the sliding doors and glass block halfway up on some. Should look nice, also have a stucco guy quoting to stucco the inside and outside of the building and the wall behind the roses, which for some reason was never done.

Landscapers should be up soon to start some work on the entire park and pool area. Also we are shopping new pool furniture and umbrellas and a pergola.

Should be all ready for this season. Make plans to spend the winter here!

Click the link below to view our current activity calendar...



Jim Lucas

Webmaster - 29 Palms RV resort